Crystal Lake dam is located at the north end of the lake in Enfield.
The following parameter is currently
being measured at this site:
Crystal Lake Stage (Lake Elevation)
Summer Operations
Lake is maintained at full pond. Full pond is 8.0 on local gauge at dam,
or top of flashboards at the dam.
Seasonal Fall Drawdown
Stop logs at dam are removed after Columbus day.
Normal drawdown reaches 4’ below full lake level.
Spring Refill
After winter ice out or, around Mid April, pond is refilled.
Note: Water levels generally fluctuate in response to precipitation,
snowmelt, drought or other meteorological conditions. Target water levels
are maintained by the adjustment of flows at the dam in response
to these conditions.
|