Island Pond Dam is located at the southern end of Island Pond in Stoddard,
approximately 1/4 mile up Treelyn Rd. off of Rt. 123 to Deer Run Rd.

The following parameters are currently being measured at this site:

Island Pond Stage (Lake Elevation)


Summer Operations
The lake level is maintained as close to the full summer recreation level as
possible, as meteorological conditions and minimum flow requirements allow.
Full summer recreation level is 0 on the gage at Island Pond Dam, which
corresponds to an elevation of 1281.63.

Seasonal Fall Drawdown
Drawdown begins on or near Columbus Day.  The lake is drawn down 3 feet
(elev. 12978.63) below the summer recreation level, and full drawdown is 
generally reached by November or December in most years. The drawdown is
accomplished by pulling stoplogs and opening gate at the dam.

Spring Refill
Lake is refilled to the full summer recreation level between March and June
1st as the snowpack melts and spring rains occur. 

Operations at Island Pond Dam must be coordinated with Highland Lake Dam upstream in order to match flows and avoid flooding/draining of either of the impoundments.  


Note: Water levels generally fluctuate in response to precipitation,
snowmelt, drought or other meteorological conditions. Target water levels 
are maintained by the adjustment of flows at the dam in response 
to these conditions.

Related Information

NH Department of Environmental Services | 29 Hazen Drive | PO Box 95 | Concord, NH 03302-0095
(603) 271-3503 | TDD Access: Relay NH 1-800-735-2964 | Hours: M-F, 8am-4pm

copyright 2008. State of New Hampshire